|
| Search |
|---|
| Is air tightness testing mandatory? |
|
Yes, buildings need to demonstrate a minimum level of air permeability (10m3/h/m2) and in the majority of cases this is done through an on-site, pre-completion test. This is not an onerous requirement in itself but the design air permeability for a particular building may be lower to achieve the overall carbon emission rate for the building and/or client specification. |